|
1.Remove the luggage room floor carpet.
|

|
2.Remove the electric motor unit inspection lid. 3.Remove the inverter service lid (refer to .)
|

|
4.Remove each installation screw and remove the high-voltage fuse. 5.check the resistance between the high-voltage fuses, and if there is no continuity (open circuit), replace the high-voltage fuses. 6.
caution |
When tightening the installation screws, secure the high-voltage fuse terminal portion, because there is a risk of damage to the high-voltage fuse when an excessive force applies to the high-voltage fuse main body.
|
Tighten each installation screw to the specified torque. Tightening torque: 1.8 ± 0.1 N·m 7.Install the inverter service lid (refer to .) 8.Install the electric motor unit inspection lid. 9.Install the luggage room floor carpet.
|