REMOVAL AND INSTALLATION <6B3>



Pre-removal Operation
  • Engine Coolant Draining (Refer to ).
  • Timing Belt Removal (Refer to GROUP 11C - Timing Belt ).

Post-installation Operation
  • Timing Belt Installation (Refer to GROUP 11C - Timing Belt ).
  • Engine Coolant Refilling (Refer to ).





Removal steps


1.
Water pump


2.
Water pump gasket





Yandex.Metrika
MMC-Manuals.ru