
|
1.Perform the pre-conditioning interim operation several times. 2.Measure the torque when each shift position is operated on the fixed nut at the control
shaft main side.
|
|
REFERENCE VALUE
Lever position
|
Operation torque N·m
|
P→R (parking system: engagement)
|
2.4 -
3.5
|
R→P
|
2.0 -
3.0
|
R<=>N<=>D<=>Eco<=>B
|
1.4 -
2.0
|
|
|